CL61-first scheduling and automation boundary

Current state

The CL61 is the first instrument in the power plan and the only future automation candidate. The shipped state is still advisory / observe-only: no dashboard service, mobile endpoint, forecast job, or development product can contact the ASS PDU.

Development may publish three small diagnostic products beside its isolated operating-scenario Zarr:

  • cl61_automation_intent.json
  • cl61_automation_status.json
  • cl61_automation_history.jsonl

They are enabled only by AURORA_CL61_AUTOMATION_SHADOW_ENABLED=true. Their authority is always diagnostic, their safety field has control_eligible=false, and the status has mode=observe_only and capability=false. A missing or malformed product is represented as unavailable; it is never interpreted as permission to act.

GET /mobile/v1/power/cl61-automation exposes only that status. It is a GET endpoint with no command, arm, write, restart, or PDU route. The development iOS build reads it only from data-ocean and rejects any status that claims a capability or names an outlet other than CL61 / outlet 5.

Schedule physics

The 96-hour plan is evaluated against the 240-hour P10 reserve tail. It first finds a feasible CL61 timetable using the finite-state load model, three-array solar forecast, battery ensemble, learned CL61 heater/blower phase, 12-hour minimum runs, and at most one scheduled start per UTC day. Only then may Radar and HATPRO use residual reserve.

An already-on CL61 is held through the planning horizon rather than treated as an implicit switch-off. Existing Radar or HATPRO loads are also held at their observed PDU state: the CL61 controller cannot silently change another outlet, so the forecast must not borrow energy from a fictional stop. The product marks those states as held observations. An unsafe diagnostic trace is not an instruction to change equipment.

Quantitative implementation plan

The work proceeds in capability lanes, with all forecast data and artifacts kept separate from the operational baseline. No CL61 action is an acceptance criterion for the early lanes.

Stage Deliverable Evidence required before advancing
1. Frozen comparison Immutable same-cycle baseline and candidate bundles, with full forecast identity and checksums No candidate write to baseline products; every scored pair is complete and reproducible
2. Physical solar Three-array POA/PV v2, sub-hourly battery integration, controller-curtailment masking Energy conservation; per-array/total daylight skill only on MPP-active data; no censored delivery scored as available PV
3. Finite-state load Exact PDU state and phase model, DC/AC-bus accounting, explicit UAS recovery branch State-held episode skill; phase totals and component loads are never added together; mixed UAS docks remain explicit or abstained
4. Development shadow CL61-first schedule, status/history, and the additive development iOS view All paths remain development-only and read-only; unknown/stale input gives an unavailable or hold result
5. Future start-only trial Edge-local controller capability, after a separate operator decision The quantitative gates below plus independent local PDU/SNMP and readback review

Run four immutable, same-input evaluation lanes: A frozen baseline; B physical solar only; C revised finite-state load only; and D the combined forecast. Solar-only pairs keep the baseline load byte-identical; load-changing pairs share only the raw cutoff, source checksum, SOC anchor, battery contract, and solar forcing. A model/configuration change starts a new campaign and cannot inherit earlier evidence.

The current rolling view is a health diagnostic, not promotion evidence. The cumulative campaign uses independent ECMWF cycles (not cached re-anchors), half-open UTC windows, complete source manifests, and cycle-clustered paired statistics. Sparse cloud/state/degraded-mode strata remain explicitly diagnostic.

Forecast gates

For a development forecast replacement, require at least 30 paired independent cycles across 10 UTC days and all of the following:

  • Combined 0–24-hour SOC MAE improves by at least 10%; neither 0–6 nor 6–24 hours worsens by more than 2%.
  • Both 0–6 and 6–24-hour SOC persistence skill are positive. A short-lead-only result is insufficient.
  • Solar MAE and absolute load bias each improve by at least 10%; P10–P90 coverage is 75–90%; quantile ordering and SOC limits hold.
  • The same baseline ECMWF site members must be propagated through the candidate-only physical model. Candidate ensemble CRPS must beat both the baseline ensemble and SOC persistence, while P10–P90 coverage remains 75–90%. Reserve-event Brier skill must pass when at least ten events exist; otherwise the review records insufficient_events rather than claiming a pass.
  • Each longer lead has non-negative persistence skill or at least 25% lower MAE than baseline without worse absolute bias.

Before considering an outlet-5 trial, raise that bar to at least 60 independent cycles over 30 days, at least 95% successfully paired eligible cycles, 100% complete scored bundles, and adequate clear/cloudy and important-state coverage. The 6–24 and 24–48-hour SOC buckets must have positive persistence skill, no reserve false-safe event may be accepted, and the paired confidence interval for the primary SOC improvement must exclude zero. Physical solar also needs surveyed array/controller facts or an explicitly bounded provisional contract, plus MPP-active verification. UAS recovery remains a conservative 0.20-kWh planning allowance until at least 20 complete, mapped recoveries are available.

Safe rollout sequence

  1. Release the dashboard and cloud changes only to development; publish the shadow files next to the isolated development power product and leave the operational mobile payload unchanged.
  2. Build the explicit AuroraDashboardDevelopment app against data-ocean. Its CL61 card is observational and rejects any executable status.
  3. Run the focused edge playbook in check mode, then (only with a separate deployment decision) install the no-network observer. The observer is a receipt/audit service, not a controller.
  4. Accumulate and review the campaign evidence. A status, a dashboard plot, or a passing one-day rolling score never authorises an outlet action.
  5. Only after a further explicit operator decision can the future start-only capability be considered. Automatic stop remains off until a subsequent, separately reviewed experiment.

Future local controller

The companion edge implementation is intentionally separate from the cloud forecast. It has two systemd lanes:

  1. A root-owned observer with IPAddressDeny=any, which can record a shadow receipt but cannot reach any PDU.
  2. A disabled controller timer, limited to the PDU address, requiring all of: a locally installed immutable release, deployment capability enabled, a local capability sentinel, a bounded arm lease, a signed operational intent, current local SOC/PDU health, outlet-5 readback, and no manual override or fault latch.

No component currently produces a signed operational intent. Even after a future deployment capability change, automatic stops remain separately disabled until they receive their own explicit approval. A failed command or readback latches fault; retries stop until an operator clears it. Disarming never changes the physical outlet state.

The promotion evidence and local preflight must be reviewed before the edge activation runbook is used. This document is not an operational instruction.