Forecast improvement: evidence foundation, 22 September 2026

Confirmed defect

Live development archive metadata retained old <U3 storage encodings after concatenation. Complete strings became for, pow, 5e7, and ecm. The forecast model contract itself retained its full value. Empty deterministic verification was therefore a data-integrity failure, not evidence of zero skill.

Implemented

  • Deterministic and ensemble archive writers use a shared staging writer that discards inherited encodings, preserves nanosecond datetimes, verifies all coordinates and textual provenance after reopening, and restores the prior archive if activation fails.
  • Recovered 128 verified immutable forecast issues and 64 distinct source-cycle IDs without guessing missing metadata. These are archive inventory counts, not promotion-eligible counts; campaign identity, maturity and diversity gates still apply.
  • Original damaged deterministic archive retained at /data/aurora/dev-products/power/candidates/archive-repair-20260922/original-damaged-archive.zarr.
  • Separate live collector copies checksum-verified issues, admits only matching ensemble anchors/cycles and preserves comparator bytes. It runs in an isolated 1500 MiB, 25%-CPU, network-disabled service, deferring during evaluator/replay activity. It writes only a private candidate tree, never products or controls.
  • Capture and ensemble matching are not candidate generation, scientific acceptance, or grid-alignment acceptance. Collector manifests say so explicitly.

Validation

100 tests passed in the server runtime under a 1500 MiB cgroup, including memory, forecast, hybrid and new archive round-trip regression tests. Eight collector tests cover idempotency, tampering, overlap, symlinks, concurrent locking, exact anchors/cycles and read-only staging cleanup. Local bundled Python lacked xarray and Dask, so no local-runtime pass is claimed.

Operational boundaries

Only development timers were paused; the in-flight refresh was allowed to finish. Both timers were restored after deployment. Production, frozen v10 evidence, the old replay tree, wider evaluator and instrument controls are unchanged.

Still required before promotion

  1. Feed captured issues into a candidate worker with explicit source-latency evidence, frozen issue-time predictors, and separate matured-truth rescoring. This collector deliberately does not assert that it captures those predictors.
  2. Confirm installed panel geometry and MPPT/charge-acceptance evidence before calibrating available PV. Do not learn uncurtailed PV from battery-limited delivered power.
  3. Diagnose residual-training exclusions using recovered identities; fit and validate component/phase loads without relaxing exact-state safeguards.
  4. Preserve matching baseline ensembles, propagate memberwise physical PV/load/ battery uncertainty and calibrate with blocked held-out evidence.
  5. Retain all original promotion thresholds: at least 30 paired independent cycles per bucket over 10 UTC days plus diversity and scientific gates.

Recovery / rollback boundary

Pre-change forecast source: 5e702ed95c3023b9bd042fb23fb1f05d22ba700f. Initial archive fix: 28538138c456fda075e278e2fc9e686efc9cbadc. The root-only dashboard.env.before is retained in the recovery directory. Do not print or commit that file; it contains unrelated operational secrets.

Rollback requires idle forecast writers and their exclusive generator lock. Restore code and its matching provenance together; preserve the current archive before replacing it. Returning to the old writer reintroduces the truncation defect, so rollback is an operational escape hatch, not a preferred state.